TECHNOLOGY AND MANUFACTURING

Colorado-Crude-Carriers.jpg

Colorado Crude Carriers

A 19,890 sf office and garage design build for Colorado Crude Carriers. All new systems included a new 1000 amp service, owner equipment connections, lighting with controls, HVAC, fire alarm, security, telecommunications, and A/V.

Location: Greeley, Colorado

General Contractor: Hall Irwin Construction

Architect: Thorp Associates P.C.

Engineer: SRB Consulting Engineering

Longmont_opening_shot.png

Oncore Manufacturing

Design / Build of a 58,800 square foot manufacturing and office facility. New 2,000 amp service, power distribution, energy efficient lighting/ lighting control, fire alarm, Communications, and electrical connections to owner furnished equipment.

Location: Longmont, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: Adonai Professional Services

primstar.jpg

Primestar Solar

Remodel of a portion of an existing commercial building to accommodate an operation to manufacturer photo-voltaic solar panels, including a new electrical service and extensive large feeders.

Location: Arvada, CO

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: Adonai Professional Services

Nist.jpg

National Institute of Standards and Technology – Temperature Controls

This advanced testing laboratory facility is 284,000 square feet and three levels of technical laboratories, a six-bay clean room block, and supporting administrative spaces. With temperature control, vibration control, and power quality, the lab spaces have achieved a level of environmental stability not yet replicated anywhere else on campus

Location: Boulder, CO

General Contractor: Whiting Turner

Architect: HDR Architecture

Engineer: Johnson Controls

Xilinx.jpg

Xilinx

A $3 million plus design-build contract engineered in-house by Merit Electric. A "Class A" software development center of 130,000 square feet in Longmont, Colorado, the project incorporated a data center, UPS and generator backup of critical loads, a raised floor power distribution system throughout the facility, and sophisticated daylight-sensing control of dimming T-5 indirect lights.

General Contractor: The Neenan Company

Architect: The Neenan Company

Engineer: Merit Electric

LSI.jpg

LSI Logic

A $1.1 million plus design-build contract. A "Class A" office building of approximately 60,000 square feet in Fort Collins, Colorado, the project incorporated UPS and generator backup of critical loads as well as indirect lighting and low voltage lighting controls.

General Contractor: Alliance Construction Solutions

Architect: RNL Design

Engineer: Merit Electric/Swanson Rink

maxtor.jpg

Maxtor

A $6.8 million plus design-build contract completed in nine months. Consisted of the remodel of four single-story buildings and a new construction infill to create a new lab and manufacturing facility of approximately 470,000 square feet in Longmont, Colorado. Included extensive clean rooms, a data center, and UPS and generator back-up of critical loads.

General Contractor: Pratt Construction

Architect: Melick Associates, Inc.

Engineer: Merit Electric/Gordon Gumeson