Water Treatment
| Project Name: | Clear Creek County Water Treatment Plant | |
| General Contractor: | Hydro Construction | |
| Engineer: | Rothberg, Tamburini & Winsor | |
| Contract Value: | $113,656 |
| Project Name: | Clear Creek County Water Treatment Plant | |
| General Contractor: | Hydro Construction | |
| Engineer: | Rothberg, Tamburini & Winsor | |
| Contract Value: | $113,656 |
| Project Name: | Milliken Well Water Treatment | ||
| General Contractor: | Hall Irwin | ||
| Contract Value: | $83,002 |
| Project Name: | Milliken Public Works | |
| General Contractor: | Hall Irwin | |
| Architect: | Thorp & Associates | |
| Engineer: | Merit Electric | |
| Contract Value: | $48,835 |
| Project Name: | Mulberry Water Treatment |
| General Contractor: | Hydro Construction |
| Contract Value: | $79,985 |
| Project Name: | NBB Water Treatment Plant |
| General Contractor: | Sanotec |
| Architect: | Sanotec |
| Engineer: | Merit Electric |
| Contract Value: | $254,985 |
| Project Description: | Purpose of this operation is the optimization of the existing water treatment plant through the construction of a new anaerobic reactor (UASB). The purified water will be further treated by microfiltration and reverse osmosis as it has to be reused. Furthermore, the biogas produced by the installation will be used for the production of electricity. In phase 1 the installation will have a capacity of 550 m3 waste water per day, in phase 2 the capacity may be increased to 1100 m3 per day. |